Licensed & certified since 1995 — Call now: 530-345-8562 — Serving all of California
AllianceUtility Project Hazmat
Home / Pre-Demolition Hazmat Survey
Pre-demolition survey · California

Pre-demolitionhazmat survey

Before a structure comes down, regulated materials have to be found and removed. A survey keeps the demo on schedule and the project compliant.

Certifications & Licenses
CA
DOSH
Asbestos Registration#1090
OSHA
40-Hr HAZWOPERCertified
EPA
Lead-Safe CertifiedFirm
CSLB
Contractor License#776274
BBB
Accredited BusinessA+ Rating
Why survey first

Find it beforeit finds you

Federal asbestos rules (NESHAP) require an asbestos inspection before demolition of most facilities, and California air districts generally require notification before work starts. Lead paint, PCB-containing equipment, mercury devices and other hazardous materials can also be present in older utility and industrial structures.

A pre-demolition survey identifies what's there, where, and how much, so the prime can price abatement accurately and sequence it ahead of demolition instead of discovering it mid-project.

01

Asbestos survey

Sampling of suspect materials under Certified Asbestos Consultant oversight, analyzed by an accredited lab.

02

Lead & other hazmat

Lead paint testing by CDPH-certified inspectors, plus identification of other regulated materials.

03

Abatement scope

A clear scope and quantities the prime can use to price and schedule abatement.

Proven

Demolitionsupport

Alliance provided demolition support with hazardous-materials management for Jacobs on the Merced demolition ($85,500), and has completed more than $2M in utility-project hazmat subcontracts including Jacobs/PG&E Topock.

  1. Scope review

    We review drawings and the structure list with the prime.

  2. Survey & sampling

    Suspect materials are sampled and documented by location.

  3. Report

    Results, quantities and an abatement scope go to the prime.

  4. Abatement

    Our registered crews remove regulated materials ahead of demo.

  5. Clearance

    Clearance documentation so demolition can proceed.

Questions

Pre-Demolition Hazmat SurveyFAQ

Is an asbestos survey required before demolition?

For most facilities, federal NESHAP rules require an asbestos inspection before demolition, and California air districts typically require notification. Requirements depend on the structure and district.

What else do you look for besides asbestos?

Lead paint and other regulated materials common in older utility and industrial structures. The survey scope is set with the prime.

Can you do the abatement too?

Yes. Alliance holds CA DOSH Asbestos Registration #1090 and is an EPA Lead-Safe Certified Firm, so the same team can survey and abate.

Can you support our bid?

Yes. We provide survey pricing, abatement pricing, references and licensing for your proposal.

Have a demolition coming up?

Send the structure list and schedule. We'll scope the survey and abatement.

Get a Free Assessment →   ☎ 530-345-8562